Research on Forecasting Technology of Single Base Tower Cost in Transmission Line Engineering

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 729
Seite(n): 012042
DOI: 10.1088/1757-899x/729/1/012042
Abstrakt:

For a long time, the overhead transmission line project budget, completion settlement and financial final accounts are all valued according to the entire line. The project construction management and asset collection have not yet been refined. The management is not separately calculated according to the actual investment of different towers, and cannot be reflected in each base tower. The actual cost level and the accuracy of the cost need to be further improved. Therefore, this paper combines the actual pain points and difficulties of overhead line engineering cost management, and innovatively builds a pricing model based on a single base tower. When the company strengthens the construction drawing budget management, improves the project settlement level, accurately controls risks, and realizes high-quality management of cost management. The level of leanness is of great practical significance.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/729/1/012042.
  • Über diese
    Datenseite
  • Reference-ID
    10675353
  • Veröffentlicht am:
    12.06.2022
  • Geändert am:
    12.06.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine