Research on Forecasting Technology of Single Base Tower Cost in Transmission Line Engineering

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 729
Page(s): 012042
DOI: 10.1088/1757-899x/729/1/012042
Abstrait:

For a long time, the overhead transmission line project budget, completion settlement and financial final accounts are all valued according to the entire line. The project construction management and asset collection have not yet been refined. The management is not separately calculated according to the actual investment of different towers, and cannot be reflected in each base tower. The actual cost level and the accuracy of the cost need to be further improved. Therefore, this paper combines the actual pain points and difficulties of overhead line engineering cost management, and innovatively builds a pricing model based on a single base tower. When the company strengthens the construction drawing budget management, improves the project settlement level, accurately controls risks, and realizes high-quality management of cost management. The level of leanness is of great practical significance.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1757-899x/729/1/012042.
  • Informations
    sur cette fiche
  • Reference-ID
    10675353
  • Publié(e) le:
    12.06.2022
  • Modifié(e) le:
    12.06.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine