Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India

Author(s):

Medium: journal article
Language(s): English
Published in: Organization, Technology and Management in Construction, , n. 1, v. 8
Page(s): 1464-1481
DOI: 10.1515/otmcj-2016-0012
Abstract:

Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioners looking to institute schedule recovery measures.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/otmcj-2016-0012.
  • About this
    data sheet
  • Reference-ID
    10411611
  • Published on:
    12/02/2020
  • Last updated on:
    24/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine