Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Organization, Technology and Management in Construction, , n. 1, v. 8
Page(s): 1464-1481
DOI: 10.1515/otmcj-2016-0012
Abstrait:

Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioners looking to institute schedule recovery measures.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1515/otmcj-2016-0012.
  • Informations
    sur cette fiche
  • Reference-ID
    10411611
  • Publié(e) le:
    12.02.2020
  • Modifié(e) le:
    24.07.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine