Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Organization, Technology and Management in Construction, , n. 1, v. 8
Seite(n): 1464-1481
DOI: 10.1515/otmcj-2016-0012
Abstrakt:

Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioners looking to institute schedule recovery measures.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1515/otmcj-2016-0012.
  • Über diese
    Datenseite
  • Reference-ID
    10411611
  • Veröffentlicht am:
    12.02.2020
  • Geändert am:
    24.07.2020
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine