Prioritizing the effective strategies for construction and demolition waste management using fuzzy IDOCRIW and WASPAS methods
Author(s): |
Maryam Eghbali-Zarch
Reza Tavakkoli-Moghaddam Kazem Dehghan-Sanej Amin Kaboli |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-08-2020-0617 |
- About this
data sheet - Reference-ID
10603341 - Published on:
17/04/2021 - Last updated on:
17/04/2021