Prioritizing the effective strategies for construction and demolition waste management using fuzzy IDOCRIW and WASPAS methods
Auteur(s): |
Maryam Eghbali-Zarch
Reza Tavakkoli-Moghaddam Kazem Dehghan-Sanej Amin Kaboli |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-08-2020-0617 |
- Informations
sur cette fiche - Reference-ID
10603341 - Publié(e) le:
17.04.2021 - Modifié(e) le:
17.04.2021