An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time
Author(s): |
Wenqi Mao
Kexin Ran Ting-Kwei Wang Anyuan Yu Hongyue Lv Jieh-Haur Chen |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-04-2023-0372 |
- About this
data sheet - Reference-ID
10775277 - Published on:
29/04/2024 - Last updated on:
29/04/2024