An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time
Auteur(s): |
Wenqi Mao
Kexin Ran Ting-Kwei Wang Anyuan Yu Hongyue Lv Jieh-Haur Chen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-04-2023-0372 |
- Informations
sur cette fiche - Reference-ID
10775277 - Publié(e) le:
29.04.2024 - Modifié(e) le:
29.04.2024