Multiresource Leveling in Line-of-Balance Scheduling
Author(s): |
Atilla Damci
David Arditi Gul Polat |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2013, n. 9, v. 139 |
Page(s): | 1108-1116 |
DOI: | 10.1061/(asce)co.1943-7862.0000716 |
- About this
data sheet - Reference-ID
10169933 - Published on:
11/12/2018 - Last updated on:
11/12/2018