0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Tomczak, Michał / Polat, Gul (2023): Agregacja ocen decydentów dla systemu predykcji czasów realizacji procesów budowlanych. In: Builder, v. 317, n. 12 (22 November 2023).

    https://doi.org/10.5604/01.3001.0054.0143

  2. Turkoglu, Harun / Arditi, David / Polat, Gul (2023): Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects. In: Journal of Construction Engineering and Management, v. 149, n. 7 (July 2023).

    https://doi.org/10.1061/jcemd4.coeng-13209

  3. Terzioglu, Taylan / Polat, Gul (2022): Formwork System Selection in Building Construction Projects Using an Integrated Rough AHP-EDAS Approach: A Case Study. In: Buildings, v. 12, n. 8 (31 July 2022).

    https://doi.org/10.3390/buildings12081084

  4. Terzioglu, Taylan / Polat, Gul / Turkoglu, Harun (2022): Formwork System Selection Criteria for Building Construction Projects: A Structural Equation Modelling Approach. In: Buildings, v. 12, n. 2 (18 January 2022).

    https://doi.org/10.3390/buildings12020204

  5. Terzioglu, Taylan / Polat, Gul / Turkoglu, Harun (2021): Analysis of Formwork System Selection Criteria for Building Construction Projects: A Comparative Study. In: Buildings, v. 11, n. 12 (23 November 2021).

    https://doi.org/10.3390/buildings11120618

  6. Terzioglu, Taylan / Turkoglu, Harun / Polat, Gul (2022): Formwork Systems Selection Criteria for Building Construction Projects: A Critical Review of the Literature. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 4 (April 2022).

    https://doi.org/10.1139/cjce-2021-0190

  7. Damci, Atilla / Arditi, David / Polat, Gul (2017): Civil engineers’ personal values/demographics linkage in project team building. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017).

    https://doi.org/10.1108/ecam-08-2016-0182

  8. Damci, Atilla / Arditi, David / Polat, Gul (2013): Resource Leveling in Line-of-Balance Scheduling. In: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 9 (September 2013).

    https://doi.org/10.1111/mice.12038

  9. Arditi, David / Polat, Gul / Makinde, Samuel A. (2008): Marketing Practices of U.S. Contractors. In: Journal of Management in Engineering (ASCE), v. 24, n. 4 (October 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:4(255)

  10. Polat, Gul / Eray, Ekin / Neval Bingol, Befrin (2017): An Integrated Fuzzy Mcgdm Approach for Supplier Selection Problem. In: Journal of Civil Engineering and Management, v. 23, n. 7 (July 2017).

    https://doi.org/10.3846/13923730.2017.1343201

  11. Polat, Gul (2016): Subcontractor Selection Using the Integration of the Ahp and Promrthee Methods. In: Journal of Civil Engineering and Management, v. 22, n. 8 (November 2016).

    https://doi.org/10.3846/13923730.2014.948910

  12. Damci, Atilla / Polat, Gul (2014): Impacts of Different Objective Functions on Resource Leveling in Construction Projects: A Case Study. In: Journal of Civil Engineering and Management, v. 20, n. 4 (July 2014).

    https://doi.org/10.3846/13923730.2013.801909

  13. Polat, Gul / Donmez, Umit (2010): Marketing Management Functions of Construction Companies: Evidence From Turkish Contractors. In: Journal of Civil Engineering and Management, v. 16, n. 2 (June 2010).

    https://doi.org/10.3846/jcem.2010.31

  14. Polat, Gul (2010): Precast Concrete Systems in Developing Vs. Industrialized Countries. In: Journal of Civil Engineering and Management, v. 16, n. 1 (March 2010).

    https://doi.org/10.3846/jcem.2010.08

  15. Arditi, David / Polat, Gul (2010): Graduate Education in Construction Management. In: Journal of Professional Issues in Engineering Education and Practice, v. 136, n. 3 (July 2010).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000014

  16. Polat, Gul / Neval Bingol, Befrin (2013): A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. In: Construction Innovation, v. 13, n. 4 (October 2013).

    https://doi.org/10.1108/ci-06-2012-0034

  17. Polat, Gul (2010): Using ANP priorities with goal programming in optimally allocating marketing resources. In: Construction Innovation, v. 10, n. 3 (July 2010).

    https://doi.org/10.1108/14714171011060114

  18. Polat, Gul / Donmez, Umit (2010): ANP‐based marketing activity selection model for construction companies. In: Construction Innovation, v. 10, n. 1 (January 2010).

    https://doi.org/10.1108/14714171011017590

  19. Polat, Gul (2009): Simulation‐based efficiency assessment approach for rebar supply chains in Turkey. In: Construction Innovation, v. 9, n. 1 (January 2009).

    https://doi.org/10.1108/14714170910931570

  20. Damci, Atilla / Arditi, David / Polat, Gul (2015): Impacts of different objective functions on resource leveling in Line-of-Balance scheduling. In: KSCE Journal of Civil Engineering, v. 20, n. 1 (February 2015).

    https://doi.org/10.1007/s12205-015-0578-7

  21. Damci, Atilla / Arditi, David / Polat, Gul (2013): Multiresource Leveling in Line-of-Balance Scheduling. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000716

  22. Algarni, Ayed Muhammad / Arditi, David / Polat, Gul (2007): Build-Operate-Transfer in Infrastructure Projects in the United States. In: Journal of Construction Engineering and Management, v. 133, n. 10 (October 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:10(728)

  23. Al-Sobiei, Obaid Saad / Arditi, David / Polat, Gul (2005): Managing Owner's Risk of Contractor Default. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:9(973)

  24. Polat, Gul / Arditi, David / Mungen, Ugur (2007): Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar. In: Journal of Construction Engineering and Management, v. 133, n. 1 (January 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:1(29)

  25. Polat, Gul / Arditi, David / Ballard, Glenn / Mungen, Ugur (2006): Economics of on‐site vs. off‐site fabrication of rebar. In: Construction Management and Economics, v. 24, n. 11 (November 2006).

    https://doi.org/10.1080/01446190500529432

  26. Polat, Gul / Arditi, David (2005): The JIT materials management system in developing countries. In: Construction Management and Economics, v. 23, n. 7 (September 2005).

    https://doi.org/10.1080/01446190500041388

  27. Al‐Sobiei, Obaid Saad / Arditi, David / Polat, Gul (2005): Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. In: Construction Management and Economics, v. 23, n. 4 (May 2005).

    https://doi.org/10.1080/01446190500041578

  28. Polat, Gul (2008): Factors Affecting the Use of Precast Concrete Systems in the United States. In: Journal of Construction Engineering and Management, v. 134, n. 3 (March 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:3(169)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine