Multi-modal optimization for time–cost–quality–work continuity trade-off in construction projects using a hybrid based on SMA and M&C
Author(s): |
Pham Vu Hong Son
Luu Ngoc Quynh Khoi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Asian Journal of Civil Engineering, October 2023, n. 2, v. 25 |
Page(s): | 1825-1839 |
DOI: | 10.1007/s42107-023-00880-2 |
- About this
data sheet - Reference-ID
10735312 - Published on:
03/09/2023 - Last updated on:
10/02/2024