Pham Vu Hong Son
- Develop a data-driven approach under the integration of 4D visualization and process mining to simulate, diagnose and predict real-world construction execution. In: Asian Journal of Civil Engineering, v. 25, n. 8 (24 September 2024). (2024):
- Research on applying machine learning models to predict and assess return on assets (ROA). In: Asian Journal of Civil Engineering, v. 25, n. 5 (April 2024). (2024):
- Steel slag aggregate low-cement concrete: Engineering performance, microstructure and sustainability. In: Construction and Building Materials, v. 436 (July 2024). (2024):
- Applying ant colony optimization algorithm to optimize construction time and costs for mass concrete projects. In: Asian Journal of Civil Engineering, v. 25, n. 4 (February 2024). (2024):
- Application of modified symbiotic organisms search (msos) algorithm hybrid with Bayesian optimization leveling (bol) algorithm to propose optimal resource cost options. In: Asian Journal of Civil Engineering, v. 25, n. 4 (February 2024). (2024):
- Construction management multiple-objective trade-off problems using the flow direction algorithm (FDA). In: Asian Journal of Civil Engineering, v. 25, n. 4 (February 2024). (2024):
- Multi-modal optimization for time–cost–quality–work continuity trade-off in construction projects using a hybrid based on SMA and M&C. In: Asian Journal of Civil Engineering, v. 25, n. 2 (October 2023). (2023):
- Adaptive selection slime mould algorithm in time–cost–quality–environmental impact trade-off optimization. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 9 (September 2023). (2023):
- Optimization in Construction Management Using Adaptive Opposition Slime Mould Algorithm. In: Advances in Civil Engineering, v. 2023 (February 2023). (2023):
- Optimizing time and cost simultaneously in projects with multi-verse optimizer. In: Asian Journal of Civil Engineering, v. 24, n. 7 (April 2023). (2023):
- Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects. In: Asian Journal of Civil Engineering, v. 24, n. 7 (April 2023). (2023):
- Building projects with time–cost–quality–environment trade-off optimization using adaptive selection slime mold algorithm. In: Asian Journal of Civil Engineering, v. 24, n. 5 (December 2022). (2022):
- Optimization of Construction Material Cost through Logistics Planning Model of Dragonfly Algorithm — Particle Swarm Optimization. In: KSCE Journal of Civil Engineering, v. 25, n. 7 (May 2021). (2021):
- Hybrid Bayesian Fuzzy-Game Model for Improving the Negotiation Effectiveness of Construction Material Procurement. In: Journal of Computing in Civil Engineering, v. 29, n. 6 (November 2015). (2015):
- Optimize negotiation price in construction procurement using Bayesian Fuzzy Game Model. In: KSCE Journal of Civil Engineering, v. 19, n. 6 (December 2014). (2014):