Multi-modal optimization for time–cost–quality–work continuity trade-off in construction projects using a hybrid based on SMA and M&C
Auteur(s): |
Pham Vu Hong Son
Luu Ngoc Quynh Khoi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, octobre 2023, n. 2, v. 25 |
Page(s): | 1825-1839 |
DOI: | 10.1007/s42107-023-00880-2 |
- Informations
sur cette fiche - Reference-ID
10735312 - Publié(e) le:
03.09.2023 - Modifié(e) le:
10.02.2024