- Artificial intelligence models to predict optimal trade-off on construction management. Dans: Engineering, Construction and Architectural Management. :
- Multi-modal optimization for time–cost–quality–work continuity trade-off in construction projects using a hybrid based on SMA and M&C. Dans: Asian Journal of Civil Engineering, v. 25, n. 2 (octobre 2023). (2023):
- Adaptive selection slime mould algorithm in time–cost–quality–environmental impact trade-off optimization. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 9 (septembre 2023). (2023):
- Optimization in Construction Management Using Adaptive Opposition Slime Mould Algorithm. Dans: Advances in Civil Engineering, v. 2023 (février 2023). (2023):
- Adaptive opposition slime mold algorithm for time–cost–quality–safety trade-off for construction projects. Dans: Asian Journal of Civil Engineering, v. 24, n. 7 (avril 2023). (2023):
- Building projects with time–cost–quality–environment trade-off optimization using adaptive selection slime mold algorithm. Dans: Asian Journal of Civil Engineering, v. 24, n. 5 (décembre 2022). (2022):