0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):

Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 2, v. 11
Page(s): 101-103
DOI: 10.2749/101686601780347129
Abstract:

The Modong Hongshui River Bridge forms a vital component of the dual three-lane expressway between Nanning and Liuzhou, Guangxi Province in the south-western part of China. It is a reinforced concrete arch bridge with a main span of 180 m. The arch ribs were built using precast concrete segments erected by cantilever construction method with tiebacks. This technique has been well tried in the construction of cable-stayed bridges. As the tiebacks are temporary and therefore recoverable, the method is considered very economical.

Structures and Projects

Geographic Locations

  • About this
    data sheet
  • Reference-ID
    10000822
  • Published on:
    16/08/2001
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine