0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 2, v. 11
Page(s): 101-103
DOI: 10.2749/101686601780347129
Abstrait:

The Modong Hongshui River Bridge forms a vital component of the dual three-lane expressway between Nanning and Liuzhou, Guangxi Province in the south-western part of China. It is a reinforced concrete arch bridge with a main span of 180 m. The arch ribs were built using precast concrete segments erected by cantilever construction method with tiebacks. This technique has been well tried in the construction of cable-stayed bridges. As the tiebacks are temporary and therefore recoverable, the method is considered very economical.

Ouvrages et projets

Lieux géographiques

  • Informations
    sur cette fiche
  • Reference-ID
    10000822
  • Publié(e) le:
    16.08.2001
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine