0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 1999
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Hongshui River

Technical Information

Dimensions

main span 180 m
total length 308 m
deck deck width 12 m

Materials

arch reinforced concrete

Chronology

June 1999

Opening to traffic

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001743
  • Published on:
    16/08/2001
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine