0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelling of Time, Cost and Risk of Construction with Using Fuzzy Logic

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Journal of Civil Engineering and Management, , n. 6, v. 27
Page(s): 412-426
DOI: 10.3846/jcem.2021.15255
Abstract:

The paper presents an overview of the literature from recent years devoted to planning the time, costs and risk of a construction investment using fuzzy logic. It also presents three own original models concerning the issue. The first model is used to build a fuzzy construction schedule taking into account fuzzy norms and the number of workers. The costing model uses fuzzy inference from CBR cases. The aim was to increase the accuracy and correctness of the cost calculation performed for the investor in the construction and investment process with a certain degree of vagueness of the available information about materials. In the last of the presented models, fuzzy sets were used to assess the effects of technological and construction (implementation) risk factors. The presented examples prove the usefulness of fuzzy logic in solving problems in construction, where we have incomplete and imprecise information.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/jcem.2021.15255.
  • About this
    data sheet
  • Reference-ID
    10625870
  • Published on:
    26/08/2021
  • Last updated on:
    26/08/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine