0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Edyta Plebankiewicz ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Plebankiewicz, Edyta (2024): Procedures for Awarding Work Contracts in Europe. In: Buildings, v. 14, n. 4 (27 March 2024).

    https://doi.org/10.3390/buildings14040883

  2. Plebankiewicz, Edyta / Zima, Krzysztof / Wieczorek, Damian (2021): Modelling of Time, Cost and Risk of Construction with Using Fuzzy Logic. In: Journal of Civil Engineering and Management, v. 27, n. 6 (16 July 2021).

    https://doi.org/10.3846/jcem.2021.15255

  3. Radziszewska-Zielina, Elżbieta / Sobotka, Anna / Plebankiewicz, Edyta / Zima, Krzysztof (2013): Preliminary identification and evaluation of parameters affecting the capacity of the operator-earthmoving machine system. In: Budownictwo i Architektura, v. 12, n. 1 (March 2013).

    https://doi.org/10.35784/bud-arch.2173

  4. Kozik, Renata / Plebankiewicz, Edyta (2013): Bid documentation in public procurement in Poland. In: Organization, Technology and Management in Construction, v. 5, n. 1 (June 2013).

    https://doi.org/10.5592/otmcj.2013.1.8

  5. Zima, Krzysztof / Plebankiewicz, Edyta (2012): Analysis of the building shape erected in Krakow and its impact on construction costs. In: Organization, Technology and Management in Construction, v. 4, n. 1 (June 2012).

    https://doi.org/10.5592/otmcj.2012.1.6

  6. Zima, Krzysztof / Plebankiewicz, Edyta / Wieczorek, Damian (2019): A SWOT Analysis of the Use of BIM Technology in the Polish Construction Industry. In: Buildings, v. 10, n. 1 (19 December 2019).

    https://doi.org/10.3390/buildings10010016

  7. Malara, Jarosław / Plebankiewicz, Edyta / Juszczyk, Michał (2019): Formula for Determining the Construction Workers Productivity Including Environmental Factors. In: Buildings, v. 9, n. 12 (21 November 2019).

    https://doi.org/10.3390/buildings9120240

  8. Leśniak, Agnieszka / Plebankiewicz, Edyta (2015): Modeling the Decision-Making Process Concerning Participation in Construction Bidding. In: Journal of Management in Engineering (ASCE), v. 31, n. 2 (March 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000237

  9. Plebankiewicz, Edyta (2010): Construction Contractor Prequalification From Polish Clients’ Perspective. In: Journal of Civil Engineering and Management, v. 16, n. 1 (March 2010).

    https://doi.org/10.3846/jcem.2010.05

  10. Plebankiewicz, Edyta (2012): A fuzzy sets based contractor prequalification procedure. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.11.003

  11. Plebankiewicz, Edyta / Kubek, Daniel (2016): Multicriteria Selection of the Building Material Supplier Using AHP and Fuzzy AHP. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001033

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine