- (2024): Procedures for Awarding Work Contracts in Europe. Dans: Buildings, v. 14, n. 4 (27 mars 2024).
- Modelling of Time, Cost and Risk of Construction with Using Fuzzy Logic. Dans: Journal of Civil Engineering and Management, v. 27, n. 6 (16 juillet 2021). (2021):
- Preliminary identification and evaluation of parameters affecting the capacity of the operator-earthmoving machine system. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013). (2013):
- Bid documentation in public procurement in Poland. Dans: Organization, Technology and Management in Construction, v. 5, n. 1 (juin 2013). (2013):
- Analysis of the building shape erected in Krakow and its impact on construction costs. Dans: Organization, Technology and Management in Construction, v. 4, n. 1 (juin 2012). (2012):
- (2019): A SWOT Analysis of the Use of BIM Technology in the Polish Construction Industry. Dans: Buildings, v. 10, n. 1 (19 décembre 2019).
- (2019): Formula for Determining the Construction Workers Productivity Including Environmental Factors. Dans: Buildings, v. 9, n. 12 (21 novembre 2019).
- Modeling the Decision-Making Process Concerning Participation in Construction Bidding. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 2 (mars 2015). (2015):
- Construction Contractor Prequalification From Polish Clients’ Perspective. Dans: Journal of Civil Engineering and Management, v. 16, n. 1 (mars 2010). (2010):
- A fuzzy sets based contractor prequalification procedure. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- Multicriteria Selection of the Building Material Supplier Using AHP and Fuzzy AHP. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016). (2016):