Abstrait: |
The aim of this study is to build a mathematical model of the productivity of construction workers. It does so by selecting 17 factors that influence the productivity of construction workers and categorising them into five groups. For the mathematical description of the factors, fuzzy logic was used. A formula for calculating the work productivity of construction workers is proposed. The novelty of the approach proposed by the authors is rooted in the consideration of various factors that have the potential to influence the productivity of construction workers. To present the way the formula operates, a single assessment of ceiling formwork was undertaken. The verification of a model confirmed its capability of analyzing, evaluating, and predicting the productivity of construction workers with satisfying accuracy. |
Copyright: | © 2019 by the authors; licensee MDPI, Basel, Switzerland. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
0.86 MB
- Informations
sur cette fiche - Reference-ID
10399921 - Publié(e) le:
12.12.2019 - Modifié(e) le:
02.06.2021