- (2019): On the Search of Models for Early Cost Estimates of Bridges: An SVM-Based Approach. Dans: Buildings, v. 10, n. 1 (19 décembre 2019).
- (2019): Formula for Determining the Construction Workers Productivity Including Environmental Factors. Dans: Buildings, v. 9, n. 12 (21 novembre 2019).
- Forecasting of Sports Fields Construction Costs Aided By Ensembles of Neural Networks. Dans: Journal of Civil Engineering and Management, v. 25, n. 7 (novembre 2019). (2019):