Modelling of Time, Cost and Risk of Construction with Using Fuzzy Logic

Autor(en): ORCID
ORCID
ORCID
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Civil Engineering and Management, , n. 6, v. 27
Seite(n): 412-426
DOI: 10.3846/jcem.2021.15255
Abstrakt:

The paper presents an overview of the literature from recent years devoted to planning the time, costs and risk of a construction investment using fuzzy logic. It also presents three own original models concerning the issue. The first model is used to build a fuzzy construction schedule taking into account fuzzy norms and the number of workers. The costing model uses fuzzy inference from CBR cases. The aim was to increase the accuracy and correctness of the cost calculation performed for the investor in the construction and investment process with a certain degree of vagueness of the available information about materials. In the last of the presented models, fuzzy sets were used to assess the effects of technological and construction (implementation) risk factors. The presented examples prove the usefulness of fuzzy logic in solving problems in construction, where we have incomplete and imprecise information.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3846/jcem.2021.15255.
  • Über diese
    Datenseite
  • Reference-ID
    10625870
  • Veröffentlicht am:
    26.08.2021
  • Geändert am:
    26.08.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine