0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection

Author(s):


Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 4, v. 18
Page(s): 396-402
DOI: 10.2749/101686608786455199
Abstract:

Maocaojie Bridge is a half-through concrete-filled steel tube (CFST) tied-arch bridge in the Hunan Province of China. A model of this bridge with the scale ratio of 1 : 20 was built up in the laboratory. The model test investigation was performed. This work focuses on the arch rib erection method, especially the final construction stages of the bridge. In addition, the mechanical characteristics of the arch ribs and the stay cable in the process of arch rib erection are analyzed. The simulated results are compared to the field-measured data. It is shown that the simulated calculations have a satisfactory accuracy. Hence, some suggestions about construction techniques and construction control methods for this type of bridges are proposed.

Structures and Projects

  • About this
    data sheet
  • Reference-ID
    10045993
  • Published on:
    06/02/2009
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine