0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 4, v. 18
Seite(n): 396-402
DOI: 10.2749/101686608786455199
Abstrakt:

Maocaojie Bridge is a half-through concrete-filled steel tube (CFST) tied-arch bridge in the Hunan Province of China. A model of this bridge with the scale ratio of 1 : 20 was built up in the laboratory. The model test investigation was performed. This work focuses on the arch rib erection method, especially the final construction stages of the bridge. In addition, the mechanical characteristics of the arch ribs and the stay cable in the process of arch rib erection are analyzed. The simulated results are compared to the field-measured data. It is shown that the simulated calculations have a satisfactory accuracy. Hence, some suggestions about construction techniques and construction control methods for this type of bridges are proposed.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10045993
  • Veröffentlicht am:
    06.02.2009
  • Geändert am:
    13.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine