General Information
Completion: | 2006 |
---|---|
Status: | in use |
Project Type
Structure: |
Arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Concrete-filled steel tube (CFST) bridge |
Location
Technical Information
Dimensions
arch span | 366 m |
Materials
arch |
concrete-filled steel tubes
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Integer Design and Innovation Technology of Maocaojie Bridge. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004, pp. 248-249. (2004):
- Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection. In: Structural Engineering International, v. 18, n. 4 (November 2008), pp. 396-402. (2008):
- New developments on Chinese arch bridges techniques. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 815-820. (2001):
- About this
data sheet - Structure-ID
20006673 - Published on:
09/11/2002 - Last updated on:
05/02/2016