Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing
Author(s): |
Zhiyun Deng
Xinrong Liu Xiaohan Zhou Qinghui Yang Peng Chen Albert de la Fuente Lianxi Ren Libing Du Yafeng Han Fei Xiong Ru Yan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, May 2022, v. 123 |
Page(s): | 104420 |
DOI: | 10.1016/j.tust.2022.104420 |
Geographic Locations
- About this
data sheet - Reference-ID
10660419 - Published on:
28/03/2022 - Last updated on:
28/03/2022