Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing
Auteur(s): |
Zhiyun Deng
Xinrong Liu Xiaohan Zhou Qinghui Yang Peng Chen Albert de la Fuente Lianxi Ren Libing Du Yafeng Han Fei Xiong Ru Yan |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, mai 2022, v. 123 |
Page(s): | 104420 |
DOI: | 10.1016/j.tust.2022.104420 |
Lieux géographiques
- Informations
sur cette fiche - Reference-ID
10660419 - Publié(e) le:
28.03.2022 - Modifié(e) le:
28.03.2022