Fei Xiong
- Reliability assessment on stability of tunnel-type anchorages. Dans: Computers and Geotechnics, v. 125 (septembre 2020). (2020):
- Field monitoring of mechanical parameters of deep-buried jacketed-pipes in rock: Guanjingkou water control project. Dans: Tunnelling and Underground Space Technology, v. 125 (juillet 2022). (2022):
- Mechanical Behavior and Application of a Novel Supporting and Retaining Structure for Slope. Dans: Periodica Polytechnica Civil Engineering, v. 66, n. 2 ( 2022). (2022):
- Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing. Dans: Tunnelling and Underground Space Technology, v. 123 (mai 2022). (2022):
- E-M calculation model and its application of calculating deformation in a new tunnel orthogonally undercrossing an existing tunnel. Dans: Tunnelling and Underground Space Technology, v. 123 (mai 2022). (2022):
- Physical model test on the influence of the cutter head opening ratio on slurry shield tunnelling in a cobble layer. Dans: Tunnelling and Underground Space Technology, v. 120 (février 2022). (2022):
- Theoretical Study on Relaxed Surrounding Rock Pressure on Shallow Bias Neighborhood Tunnels under Seismic Load. Dans: Periodica Polytechnica Civil Engineering, v. 65, n. 4 ( 2021). (2021):
- Discussion on key points of wind load of jack-up unit. Dans: China Ocean Engineering, v. 28, n. 1 (février 2014). (2014):