0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Interactive Exhibit to Assist with Understanding Project Delays

Author(s): (Research Engineer, Centre for Innovation and Collaboration Construction Engineering (CICE), School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K. (corresponding author).)
(Barrister and Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
(Professor of Architectural Practice, Centre for Advanced Studies in Architecture (CASA), Dept. of Architecture and Civil Engineering, Univ. of Bath, Bath BA2 7AY, U.K.)
(Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 9
Page(s): 04516008
DOI: 10.1061/(asce)la.1943-4170.0000198
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000198.
  • About this
    data sheet
  • Reference-ID
    10579822
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine