0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Interactive Exhibit to Assist with Understanding Project Delays

Auteur(s): (Research Engineer, Centre for Innovation and Collaboration Construction Engineering (CICE), School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K. (corresponding author).)
(Barrister and Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
(Professor of Architectural Practice, Centre for Advanced Studies in Architecture (CASA), Dept. of Architecture and Civil Engineering, Univ. of Bath, Bath BA2 7AY, U.K.)
(Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 9
Page(s): 04516008
DOI: 10.1061/(asce)la.1943-4170.0000198
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000198.
  • Informations
    sur cette fiche
  • Reference-ID
    10579822
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine