0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Interactive Exhibit to Assist with Understanding Project Delays

Autor(en): (Research Engineer, Centre for Innovation and Collaboration Construction Engineering (CICE), School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K. (corresponding author).)
(Barrister and Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
(Professor of Architectural Practice, Centre for Advanced Studies in Architecture (CASA), Dept. of Architecture and Civil Engineering, Univ. of Bath, Bath BA2 7AY, U.K.)
(Senior Lecturer, School of Civil and Building Engineering, Loughborough Univ., Loughborough, Leicestershire LE11 3TU, U.K.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 9
Seite(n): 04516008
DOI: 10.1061/(asce)la.1943-4170.0000198
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000198.
  • Über diese
    Datenseite
  • Reference-ID
    10579822
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine