Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: multiagent optimization methodology
Author(s): |
Masoud Parsi
Vahid Baradaran Amir Hossein Hosseinian |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2023-0754 |
- About this
data sheet - Reference-ID
10755543 - Published on:
14/01/2024 - Last updated on:
14/01/2024