Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: multiagent optimization methodology
Auteur(s): |
Masoud Parsi
Vahid Baradaran Amir Hossein Hosseinian |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2023-0754 |
- Informations
sur cette fiche - Reference-ID
10755543 - Publié(e) le:
14.01.2024 - Modifié(e) le:
14.01.2024