0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improved Synchronous and Alternate Vacuum Preloading Method for Newly Dredged Fills: Laboratory Model Study

Author(s): (Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil, Construction, and Environmental Engineering, NC State Univ., Raleigh, NC 27695-7908.)
Medium: journal article
Language(s): English
Published in: International Journal of Geomechanics, , n. 8, v. 18
Page(s): 04018086
DOI: 10.1061/(asce)gm.1943-5622.0001220
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)gm.1943-5622.0001220.
  • About this
    data sheet
  • Reference-ID
    10605907
  • Published on:
    08/05/2021
  • Last updated on:
    08/05/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine