0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Improved Synchronous and Alternate Vacuum Preloading Method for Newly Dredged Fills: Laboratory Model Study

Autor(en): (Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil, Construction, and Environmental Engineering, NC State Univ., Raleigh, NC 27695-7908.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: International Journal of Geomechanics, , n. 8, v. 18
Seite(n): 04018086
DOI: 10.1061/(asce)gm.1943-5622.0001220
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)gm.1943-5622.0001220.
  • Über diese
    Datenseite
  • Reference-ID
    10605907
  • Veröffentlicht am:
    08.05.2021
  • Geändert am:
    08.05.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine