0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Improved Synchronous and Alternate Vacuum Preloading Method for Newly Dredged Fills: Laboratory Model Study

Auteur(s): (Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Professor, Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China; State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tia)
(Dept. of Civil Engineering, Tianjin Univ., Tianjin 300072 China; Key Laboratory of Coast Civil Structure Safety of Education Ministry, Tianjin Univ., Tianjin 300072 China.)
(Professor, Dept. of Civil, Construction, and Environmental Engineering, NC State Univ., Raleigh, NC 27695-7908.)
Médium: article de revue
Langue(s): anglais
Publié dans: International Journal of Geomechanics, , n. 8, v. 18
Page(s): 04018086
DOI: 10.1061/(asce)gm.1943-5622.0001220
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)gm.1943-5622.0001220.
  • Informations
    sur cette fiche
  • Reference-ID
    10605907
  • Publié(e) le:
    08.05.2021
  • Modifié(e) le:
    08.05.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine