Improved Design Method for Pre-stressed Water Tunnels
Author(s): |
N. Radončić
K. Großauer W. Schubert H. Gober G. Heigerth |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanik und Tunnelbau, 2008, n. 5, v. 1 |
Page(s): | 383-389 |
DOI: | 10.1002/geot.200800056 |
Abstract: |
The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections. |
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10031969 - Published on:
20/01/2009 - Last updated on:
15/08/2014