Improved Design Method for Pre-stressed Water Tunnels
Auteur(s): |
N. Radončić
K. Großauer W. Schubert H. Gober G. Heigerth |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Geomechanik und Tunnelbau, 2008, n. 5, v. 1 |
Page(s): | 383-389 |
DOI: | 10.1002/geot.200800056 |
Abstrait: |
The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections. |
Disponible chez: | Voir chez l'éditeur |
- Informations
sur cette fiche - Reference-ID
10031969 - Publié(e) le:
20.01.2009 - Modifié(e) le:
15.08.2014