Autor(en):




Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Geomechanik und Tunnelbau, , n. 5, v. 1
Seite(n): 383-389
DOI: 10.1002/geot.200800056
Abstrakt:

The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections.

Verfügbar bei: Siehe Verlag
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/geot.200800056.
  • Über diese
    Datenseite
  • Reference-ID
    10031969
  • Veröffentlicht am:
    20.01.2009
  • Geändert am:
    15.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine