How risk factors lead to the early termination of public–private partnership projects in China: a multi-case study based on social network analysis and interpretive-structure modeling
Author(s): |
Yunfeng Liu
Xueqing Wang Jingxiao Zhang Sijia Guo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-09-2022-0876 |