Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard
Author(s): |
Jacek Chróścielewski
Mikołaj Miśkiewicz Łukasz Pyrzowski |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Budownictwo i Architektura, December 2013, n. 3, v. 12 |
Page(s): | 247-254 |
DOI: | 10.35784/bud-arch.2039 |
Abstract: |
The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics. |
- About this
data sheet - Reference-ID
10476053 - Published on:
25/11/2020 - Last updated on:
25/11/2020