0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Budownictwo i Architektura, , n. 3, v. 12
Page(s): 247-254
DOI: 10.35784/bud-arch.2039
Abstrait:

The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.35784/bud-arch.2039.
  • Informations
    sur cette fiche
  • Reference-ID
    10476053
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine