Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard
Autor(en): |
Jacek Chróścielewski
Mikołaj Miśkiewicz Łukasz Pyrzowski |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Budownictwo i Architektura, Dezember 2013, n. 3, v. 12 |
Seite(n): | 247-254 |
DOI: | 10.35784/bud-arch.2039 |
Abstrakt: |
The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics. |
- Über diese
Datenseite - Reference-ID
10476053 - Veröffentlicht am:
25.11.2020 - Geändert am:
25.11.2020