Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study
Author(s): |
Zongzhi Li
(Assistant Professor, Dept. of Civil, Architectural and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). E-mail address:)
Sunil Madanu (Assistant Professor, Dept. of Civil, Architectural and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). E-mail address:) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Transportation Engineering, August 2009, n. 8, v. 135 |
Page(s): | 516-526 |
DOI: | 10.1061/(asce)te.1943-5436.0000012 |
- About this
data sheet - Reference-ID
10635014 - Published on:
29/11/2021 - Last updated on:
29/11/2021