0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study

Author(s): (Assistant Professor, Dept. of Civil, Architectural and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). E-mail address:)
(Assistant Professor, Dept. of Civil, Architectural and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). E-mail address:)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 8, v. 135
Page(s): 516-526
DOI: 10.1061/(asce)te.1943-5436.0000012
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)te.1943-5436.0000012.
  • About this
    data sheet
  • Reference-ID
    10635014
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine