0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study

This publication has been cited in the following 28 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10635014
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine