A green project scheduling with material ordering problem considering cost constraints and quality of materials
Author(s): |
Omid Kebriyaii
Ali Heidari Mohammad Khalilzadeh Dragan Pamucar |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-01-2024-0004 |
- About this
data sheet - Reference-ID
10789110 - Published on:
20/06/2024 - Last updated on:
20/06/2024