A green project scheduling with material ordering problem considering cost constraints and quality of materials
Auteur(s): |
Omid Kebriyaii
Ali Heidari Mohammad Khalilzadeh Dragan Pamucar |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-01-2024-0004 |
- Informations
sur cette fiche - Reference-ID
10789110 - Publié(e) le:
20.06.2024 - Modifié(e) le:
20.06.2024