La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Peiman, Farshad / Khalilzadeh, Mohammad / Shahsavari-Pour, Nasser / Ravanshadnia, Mehdi: Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-12-2022-1170

  2. Banihashemi, Sayyid Ali / Khalilzadeh, Mohammad / Antuchevičienė, Jurgita / Edalatpanah, Seyyed Ahmad (2023): Identifying and Prioritizing the Challenges and Obstacles of the Green Supply Chain Management in the Construction Industry Using the Fuzzy BWM Method. Dans: Buildings, v. 13, n. 1 (13 janvier 2023).

    https://doi.org/10.3390/buildings13010038

  3. Banihashemi, Sayyid Ali / Khalilzadeh, Mohammad (2022): A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows. Dans: KSCE Journal of Civil Engineering, v. 26, n. 6 (avril 2022).

    https://doi.org/10.1007/s12205-022-0679-z

  4. Ansari, Ramin / Khalilzadeh, Mohammad / Hosseini, M. Reza (2022): A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. Dans: KSCE Journal of Civil Engineering, v. 26, n. 3 (14 janvier 2022).

    https://doi.org/10.1007/s12205-021-0410-5

  5. Banihashemi, Sayyid Ali / Khalilzadeh, Mohammad / Antuchevičienė, Jurgita / Šaparauskas, Jonas (2021): Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach. Dans: Buildings, v. 11, n. 9 (25 août 2021).

    https://doi.org/10.3390/buildings11090387

  6. Banihashemi, Sayyid Ali / Khalilzadeh, Mohammad (2022): Evaluating Efficiency in Construction Projects with the TOPSIS Model and NDEA Method Considering Environmental Effects and Undesirable Data. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (février 2022).

    https://doi.org/10.1007/s40996-021-00669-w

  7. Zohrehvandi, Shakib / Khalilzadeh, Mohammad / Amiri, Maghsoud / Shadrokh, Shahram (2021): Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Dans: Engineering, Construction and Architectural Management, v. 29, n. 2 (mai 2021).

    https://doi.org/10.1108/ecam-08-2020-0605

  8. Banihashemi, Sayyid Ali / Khalilzadeh, Mohammad (2021): Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Dans: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021).

    https://doi.org/10.1108/ecam-05-2020-0350

  9. Zohrehvandi, Shakib / Khalilzadeh, Mohammad (2019): APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Dans: Engineering, Construction and Architectural Management, v. 26, n. 6 (juillet 2019).

    https://doi.org/10.1108/ecam-04-2018-0161

  10. Zohrehvandi, Shakib / Khalilzadeh, Mohammad / Amiri, Maghsoud / Shadrokh, Shahram (2020): A heuristic buffer sizing algorithm for implementing a renewable energy project. Dans: Automation in Construction, v. 117 (septembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103267

  11. Maghsoodi, Abteen Ijadi / Khalilzadeh, Mohammad (2017): Identification and Evaluation of Construction Projects' Critical Success Factors Employing Fuzzy-TOPSIS Approach. Dans: KSCE Journal of Civil Engineering, v. 22, n. 5 (août 2017).

    https://doi.org/10.1007/s12205-017-1970-2

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine